Projecten

  • Hydraulic Hammer Umbilical Winch Spread
    Oil & Gas
    Maleisië

    Hydraulic Hammer Umbilical Winch Spread

    To install offshore platforms, foundation or mooring piles are driven into the sea floor. These piles are installed with a hydraulic hammer at water depths of up to 1,500 meters or more. Hydrauvision is in charge of the engineering and production of a set of winches for storing the hydraulic hoses, control cable and compressed air connector for this hammer. The set consists of 2 electric hydraulic winches for storing 500 meters of 4" flexible piping and 2 winches for storing the control cable and compressed air hose.

  • Hydrauvision
    Offshore
    Netherlands

    Ten people work safely on Spool Base Work Platform

    Hydrauvision has built a gigantic safety system for the Carlyss Spool Base. On this Spool Base, steel tubing is manufactured, which is then wound onto vertically positioned reels with a diameter of 24 m. The tubes may have a length of up to 1 km and a diameter between 6 and 16 inches. The reels are positioned on a floating vessel moored at the quay.

    ‘Where ten people are working under such precarious circumstances, safety has our highest priority. That is why the platform can be moved downward very quickly when the maximum load is exceeded.’

  • HydrauRent
    Offshore
    Netherlands

    Multifunctional winch spooler also winds "other" winches

    Considering the fact that the pulling force of our rental winches differ each time, the mechanical winding method - by means of a grooved spindle construction, whereby the cable is wound by means of a parallel movement from left to right and vice versa, is not suitable.

  • HydrauRent
    Offshore
    Venice

    Venice saved from ruin

    To protect the Netherlands against the rising of the sea level, the Delta Works have been built -according to the American Society of Civil Engineers one of the seven modern wonders of the world. Hydrauvision, who also contributed to the development of the Delta Works, once again was asked to collaborate in a similarly major project - this time in Venice.

  • Hydrauvision
    Offshore
    Australia

    Successful installation RSS tower in Australia

    An extensive gas field has been discovered off the North-West coast of Australia, in the Timor Sea. To mine this liquid natural gas a floating, semi-submersible platform was built. The LNG is extracted by means of a number of hoses called umbilicals. Hydrauvision has contributed to this project, called Ichthys, by providing the suction spread - including winches, hoses and water pumps. The Ichthys project is one of the largest LNG projects in the world.

Pages