Hydrauvision has built a gigantic safety system for the Carlyss Spool Base. On this Spool Base, steel tubing is manufactured, which is then wound onto vertically positioned reels with a diameter of 24 m. The tubes may have a length of up to 1 km and a diameter between 6 and 16 inches. The reels are positioned on a floating vessel moored at the quay.
‘Where ten people are working under such precarious circumstances, safety has our highest priority. That is why the platform can be moved downward very quickly when the maximum load is exceeded.’