Projecten

  • zeesluis ijmuiden
    Civil

    New sea lock IJmuiden

    A new, larger sea lock is being built at the entrance of the North Sea Canal near IJmuiden to provide access to the Amsterdam port area. The new sea lock is 500 metres in length, 70 meters in width and has a depth of 18 metres, making it the world’s largest sea lock. Construction was started in January 2016, and the new sea lock will be ready for use by ships in early 2022. Hydrauvision also contributes to this enormous project.

  • he-dop200-is-powered-by-a-separate-power-pack_1.jpg
    Mobile

    DOP200 dredge pump for precision dredging

    Together with Damen Dredging equipment, Hydrauvision Rental offers hydraulic powerpacks in combination with a complete range of heavy-duty and cost-effective submersible dredge pumps. The compact Damen DOP pumps are directly powered by a hydraulic motor, mounted in a protective casing. 

  • Hydrauvision Firefighting
    Industries

    Hydrauvision Firefighting

    Recently, Hydrauvision has delivered an impressive Fire Fighting (FiFi) system. The system is built according to customers’ requirements and has a pump capacity of more than 80,000 liters of water per minute.

  • Bravenes van oord skidding system
    Maritime

    Skidding System for Bravenes

    Van Oord is a leader in underwater rock placement (SRI - Subsea rock installation). This is done using a fall-pipe vessel. SRI vessel Bravenes is a unique new ship within the Van Oord fleet. The ship, with a dead weight of 14,000 tonnes, can be used for the placement of a wide range of rock sizes. The skidding system is a component that facilitates placing rocks at any location.

  • Marieholmstunnel Hydrauvision
    Civil
    Sweden

    Marieholmstunnel Göteborg

    The river Göta Älv runs straight through the city of Gothenburg in Sweden. In order to relieve the pressure on the heavily congested Tingsta tunnel, an additional tunnel is being built: the Marieholm tunnel. All major highways in Gothenburg will use the new Marieholm tunnel to reduce congestion on local roads.

  • Piling Template
    Civil
    United Kingdom

    Piling templates Port of Dover

    For the construction of a new marina on the west side of Dover Harbour, hundreds of steel piles are needed to be driven into the seabed using a hydraulic hammer. Due to the very large number of piles, there was invested in two unique, innovative piling templates to be able to place them in the right position at a faster pace. In cooperation with TWD, Hydrauvision took care of the engineering, production and installation of all hydraulic components and associated piping.

  • Hydraulic power unit Icemann
    Offshore

    HydrauPack Icemann

    Ampelmann developed a new Walk-to-Work system called "Icemann", specially designed for safe and efficient transfer of crew in extremely cold conditions up to -28 degrees Celsius (-18F). Because these extreme temperatures are too low for hydraulic oil, Hydrauvision devised a solution where the system is in temperature within two hours and can be used safely.

  • winch 80 ton
    Offshore

    Multifunctional winch 80 ton

    These winches have been especially designed and built for a company that specialises in lifting heavy loads. The winches are used to control the load in the horizontal direction. The maximum pulling force of the winches is 80 tons on the first layer with a maximum storage capacity of 960 m of 52 mm cable in 8 layers. The winches are certified for offshore lifting in accordance with DNV 2.7-3.

  • Hosereel
    Offshore

    Hosereel drives with spooling device for ILT's

    Hydraulic internal lifting tools and hydraulic shackles are used by using large cranes on-board of the 'Thialf' Deepsea Crane Vessel. This equipment must be provided with hydraulic energy. Hydrauvision was instructed to deliver hydraulically driven hose reels and hydraulic power units (HPUs).

Pages